WP6

Share

WP6

Guidelines for the future massive integration of DRES in distribution grids: reference model and exploitation plan

The main result of WP6 is to provide the guidelines consisting of an accurate methodology for the appropriate DRES integration in distribution grids (both in MV and LV networks).

These guidelines have the following objectives:

  • To consider the management of the possible disturbances such as harmonics, transients, reliability and security, voltage control as well as the management of the real time system and its protection and operation requirements.
  • To improve the activities of the DSO’s demo projects that will receive feedback as well as the knowledge acquired during the Project.
  • To response to the stakeholder’s requirements to find out solutions for a massive integration of DER in distribution grids and resolving connection management problems such as balancing, curtailing, ancillary services, storage effect and reverse power flows.